- Bespoke unblocking heads cleaned and polished all tube bores ready for IRIS inspection.
- Eddy current and IRIS inspection data provided life cycle information.
A High Pressure Compressor Discharge Cooler on a North Sea platform developed leaks. To establish the extent of damage the tube bores required preparation for full Eddy Current and IRIS inspection. Tube Tech mobilised within 48 hours and came prepared for the worst as was the client brief.
Scott Donson, Technical Sales Manager: “Having our offshore trained operatives ready to mobilise at short notice was a big bonus for this client. We achieved IRIS standard inspection quickly and safely.
Send us your enquiry below and a Tube Tech International specialist will respond within 24 hours. Regardless of your industry sector or severity of fouling, we will have a solution to deliver guaranteed results.